Class Surveys During a Steel Build: Hold Points That Matter
A classed steel yacht build is punctuated by survey hold points — defined stages where a Bureau Veritas or RINA surveyor must inspect and sign before…
Build & Engineering
Owner-facing notes from the build desk — weld mapping, laminate schedules, class hold points, tankage, corrosion control and the decisions that shape a new build.

A classed steel yacht build is punctuated by survey hold points — defined stages where a Bureau Veritas or RINA surveyor must inspect and sign before…

Ballast design for a steel sailing yacht built in Indonesia is resolved at the drawing stage: the naval architect fixes the ballast ratio — commonly 30–45%…

A custom yacht’s engine room is designed around three rules: access — every service point reachable without dismantling the boat; cooling — ventilation sized for tropical…

A tropical marine paint system is a stack with four jobs: an anticorrosive epoxy primer bonded to blasted metal, high-build epoxy barrier coats that block water,…

Fairing is the craft of turning a welded metal hull into the smooth, reflective surface owners expect of a yacht: the hull is mapped with battens…

Corrosion protection for a steel yacht in tropical waters is a three-layer system: abrasive blasting to Sa 2.5 near-white metal, a multi-coat epoxy barrier applied to…

Resin infusion and hand layup are the two ways Indonesian yards laminate FRP yacht hulls. Infusion draws measured resin through dry fabric under vacuum, producing consistent…

Aluminium yacht hulls may only be welded by welders holding current qualifications for marine aluminium alloys — tested to standards such as ISO 9606-2 or the…

A CNC kit build turns a complete set of naval architecture plans — such as a Roberts, Bruce Roberts-derived or custom stock design — into a…

Steel hull fabrication in Indonesia starts long before the first weld: certified plate is sourced with mill certificates matched to Bureau Veritas or RINA material rules,…
Send a mission profile, a stock design or your architect’s cutting files — the build desk replies with a straight technical answer, usually within one working day.